General construction process of water park equipment project

The enthusiasm for the development of water parks in China is obvious to all. More and more people want to join the construction of water parks, but blindly building plans will only be counterproductive. In the early stage of construction, we must do a good job of adequate research and preparation, and be familiar with all the processes to get twice the result with half the effort.


Pre-investigation

Before investing in development, you should visit the more successful water park industry model, and draw up information such as the site area, the customer group and the theme of the water park. Then you can find the water park equipment manufacturer. According to the information provided, the manufacturer will formulate the water park planning plan and the water park equipment configuration plan. The investor can choose the final cooperation factory according to the plan.


2. Negotiation venue

The venue is a prerequisite for the construction of a water park, and it is necessary to design a water park based on the existing venue. When choosing a venue, choose a good location to ensure a certain amount of passenger traffic. Before you talk about the venue, you should first understand the area and floor plan of the venue.


3. Waterpark Design

General water park equipment manufacturers will provide water park design services, of course, you can also find a professional design company to design the drawings of the water park. The information that the investors need to provide has the site area, the floor plan and the corresponding water park design requirements. Design the water park based on the information provided.


4. Negotiate equipment prices

If the equipment is directly produced by the water park equipment manufacturer, the price of the product will be calculated after the drawing is designed; if the design is carried out by a professional design company, the price must be negotiated with the manufacturer. For different manufacturers, the pricing method of products is different.


5. Equipment installation and finishing
After signing the venue, the venue can be renovated. In general, the manufacturer will be responsible for the transportation and installation of the water park equipment. At the same time of renovation, you can start preparations for the opening of the business, such as opening publicity activities, printing of tickets and leaflets for the park, and recruitment of service personnel.

Dual Motor Standing Desk

1.5-2.5mm thick cold rolled steel plate with high mechanical strength, smooth surface and uniform thickness.

Adopt the quality motor of which listed company to ensure that the lifting is not stuck, the lifting speed is 32mm / s.the sound under no load is less than 45dB, quiet and noiseless, and does not affect other people's office.The motor has strong power, stable power output and stable load bearing of 80kg, which can meet the needs of daily entertainment and office desktop storage. Colleagues can cooperate with the function of resistance retreat and power-off protection to ensure the safety of lifting. The power in standby mode is only 0.1W, energy saving and environmental protection.

Dual Motor Standing Desk



Dual Motor Standing Desk,Standing Desk Dual Motor,Electric Standing Desk Dual Motor,Sit Stand Desk Dual Motor,Electric Sit Stand Desk Dual Motor

Suzhou Uplift Intelligent Technology Co., Ltd , https://www.uplifting-desk.com

Posted on